Development of design documentation for the organization of rail and sea cargo transportation, including heavy and oversized cargo
Our specialists are ready to develop and coordinate the design documentation for projects of virtually any level of complexity, including for transportation and handling of:
- oversized cargo transported by universal rolling stock (gondola car, platform car, covered car);
- long loads, for which couplings of several platforms or coupling-type conveyors are needed to be used during transport;
- heavy and oversized cargo transported on conveyors (including transportation on articulated conveyors);
- PPR, VTiP, and RTK document preparation for handling heavy loads by floating or truck cranes, including when working with tandem lifting cranes;
- Technological schemes of slinging with all characteristics of the equipment used being indicated, cargo positioning and diagrams of reach and lifting capacity;
- Cargo placed on roll trailers (stowage plan, fastenings for shipping lines and agents);
Installation of safwty rail packages (SRP)
Such works are carried out by our specialists for the operations of transport requiring continuous wiring under JSC Russian Railways tracks during the Customer's work on crossing said railway tracks, including by the horizontal directional drilling (HDD) method for laying heating mains, gas pipelines, and power lines.
Development and coordination of design documentation in departments and services of the Oktyabrskaya route, including the organization of "railway windows" during the installation of the RSP, work with the rail safety, provision of railcars and motor locomotives for the delivery and unloading of materials at installation sites.
The safety packages are the company's proprietary equipment for multiple use - after use on one section of the track, they are dismantled and moved to another section in agreement with the Customer and JSC Russian Railways.
RSP installation is currently covering all the routes of Oktyabrskaya Railway of JSC Russian Railways.
Sending cargo by rail, full cycle
Development of optimal solutions for the transportation of oversized and large-scale cargo by rail, including:
- visiting the client and cargo, inspection, preparation of a preliminary transportation plan, discussion of the client's wishes, considering special cargo shipping conditions;
- selection of rolling stock;
- development and approval of technological documentation, including loading drawings;
- sending rolling stock to the departure station within the agreed time frame, working with railcar owners;
- loading accompanied by our technologist, observing that the dimensions are in accordance with the drawings;
- performance of work on securing cargo, including the supply of securing equipment;
- payment of railway tariff;
- constant monitoring of cargo en route;
- organization of cargo reception and unloading at the destination station;
The experience of the specialists working in our entity allows us to carry out transportation of any complexity, including organizing a full cycle of transportation on articulated and coupled type transporters;
Cargo handling technologies in sea ports and "dry"/city terminals, design, construction
-Our experience working with various types of cargo and handling equipment allows us to develop technical solutions handmade for you, drawing up VTiP and RTK documents along with any other necessary rules, instructions and documents;
- Upon request, we will prepare a project for your future terminal, including the design of railway tracks, container sites, warehouses, elevators, and other buildings and facilities necessary for functioning and performing full-scale transshipment activities.
- For handling your cargo, we are ready to offer our own transshipment terminals that we have designed and built ourselves, located near the Kotly and Luzhskaya stations of the Oktyabrskaya Railway.
Organization of technological "windows" through railway tracks
For 5 years, our specialists have been preparing technical documentation and securing its subsequent approval in order to organize technological “windows” for the passage of heavy and oversized cargo on the railway. This service is necessary for the delivery of cargoes from the manufacturer directly to the loading point: at the pier, or any other type of transport meeting railways along its route. Average time to prepare the necessary documents and organize the process: 30-40 calendar days from the date of receipt of the application. If necessary, the approval can be completed in a shorter time frame.
Modern technological approach
In-house design and technology department
Full cycle of documentation approval
Coordination across the entire network of JSC Russian Railways (in any region as agreed with the Customer)
Efficiency: we will calculate the cost within 2 to 3 days, and in the case of highly complex transportation, within 7 to 8 days
Consultations with the client before and during transportation on related services
Shipments are organized from where the organization's head offices are based (northwestern Russia), but also from other points of the Russian Federation
The company is a member of the SRO SASZ and the Stroyspetsproekt Association
27+ cargo transports by railway crossing secured